Sunday, February 8, 2009

ending the week

a sea of pink fiberglass insulation covered the floor when the plaster ceiling was taken down. all of this was removed in two 10 yard dump loads from the house by the end of friday day. we demoed the garage plaster walls and ceiling in a day, but still have to get it out to the dump truck. when the button board was removed we were able to check out the existing structure of the garage, and relay the information to the structural engineer.