framing continued today, creating a new opening to the exterior patio, removing the existing garage header, reinforcing top plates, and notching existing floor joists in preparation for a new steel beam. simultaneously, a 7-1/2 inch slab with 5 feet of stem wall was formed, reinforced , inspected, poured, and finished today. these images reflect this.




















No comments:
Post a Comment