Sunday, March 22, 2009

leveling and temping

a bench mark was established and a zero point located at the north west corner of the house. the opposite end of the house was found to be almost 4-1/2 inches out of level. beams and header plates were lifted with a bottle jack, and temporary shoring was put into place to achieve levelness through the house. on friday, two 13 foot parallam beams were installed to reinforce the existing structure, so as to actualize the new spaces downstairs. overall, another big week.