Saturday, June 6, 2009

sweatin' to the oldies

a productive week; a beam and column were replaced, the fireplace was installed and framed in, the walls and ceiling began to be planed and shimmed for flatness, electrical boxes began to be hung, plumbing for waste and vents were ran, and the roof was loaded with material by quite possibly the steeziest person i've met in san diego.

















No comments:

Post a Comment