the trusses continued to be rolled out, and hip jacks established. three seperate three- and four-ply girders were lifted, slid, and rolled into place; with no crane! these girders weighed 800 pounds each and span over 30 feet. catwalking [1x doug fir] spanned and stiffened the truss system. a FAU platform [for the heating unit] was set, and shear blocking was built, which will aid in the transfering of shear loads from the roof to the wall to the foundation.